Typical Simple Construction Drawing Set

| 3 Comments

This represents a typical Construction Drawing set for a simple house minus a site plan. It represents a bit over 100 hours of labor. Thought y’all might be interested. A more complete set would have framing on a separate sheet, Interior elevations at least of the kitchen and bathrooms, a site plan, Materials schedules usually called out on the floor plans, and separate electrical plans.
simple house sheet 2
vermont simple house construction drawings sheet 1vermont simple house construction drawings sheet 3vermont simple house construction drawings sheet 4vermont simple house construction drawings sheet 5vermont simple house construction drawings sheet 6vermont simple house construction drawings sheet 7

3 Comments

  1. 100 hours of labor to build the house? i think it needs way more than that.

  2. 100 hours for the construction drawing set. Probably 2 to 3 thousand hours to build it.

  3. Hello, I think your blog might be having browser compatibility issues.
    When I look at your website in Firefox, it looks fine but when opening in Internet Explorer, it has some overlapping.
    I just wanted to give you a quick heads up! Other then that, great blog!