This represents a typical Construction Drawing set for a simple house minus a site plan. It represents a bit over 100 hours of labor. Thought y’all might be interested. A more complete set would have framing on a separate sheet, Interior elevations at least of the kitchen and bathrooms, a site plan, Materials schedules usually called out on the floor plans, and separate electrical plans.







Typical Simple Construction Drawing Set
August 26, 2010 | 2 Comments

February 10, 2012 at 7:40 pm
100 hours of labor to build the house? i think it needs way more than that.
February 10, 2012 at 7:49 pm
100 hours for the construction drawing set. Probably 2 to 3 thousand hours to build it.